Road Safety Barriers for Middle East Projects

Middle East road programmes combine high design speeds, heavy truck traffic and an environment that attacks coatings — sustained heat, UV and wind-borne sand. The barrier has to hold its coating as well as its shape. SinoBarrier supplies guardrail and roller barrier systems into the region from our own factory in Shandong, China — shipped to 28+ countries on 555+ projects.

What we supply into the region

Project type System usually specified
Desert and intercity expressway W-beam guardrail runs and median barriers
Bridge, interchange and gantry approach Thrie-beam transitions and bridge end terminals
Mountain and wadi crossing Rolling barrier where a fixed beam cannot absorb the impact
Industrial and logistics compound Anti-climb roller barrier, posts and spacers

Heat, UV and sand: what changes in the specification

  • Coating. We galvanize to AASHTO M180 with a minimum 550 g/m² zinc coating. Where an owner calls for a heavier class or a duplex system, we quote the coating weight rather than describing the finish as “heavy duty”.
  • Sand abrasion. Wind-borne sand wears a coating mechanically, so on exposed alignments the coating class is worth confirming with your engineer at tender stage rather than at delivery.
  • UV. Where a PVC or painted finish is specified, the polymer grade is selected for UV exposure — the finish is a specification line, not a colour choice.

Standards and documentation

AASHTO M180 is the reference most often written into GCC road specifications, and we build to it as standard. EN 1317 documentation with CE marking is available for projects designed to European standards. Where a project needs manufacturer-side conformity documents for import — SABER registration for Saudi Arabia, for example — we supply the technical file your customs broker needs.

Delivery and paperwork

  • Standard beam lengths of 3810 mm or 4130 mm, with posts, spacers, bolts and terminals loaded into the same container.
  • Mill test certificates and coating-weight reports are issued per heat number, so the paperwork traces back to the steel.
  • Commercial invoice, packing list, bill of lading and certificate of origin are issued with the shipment.
  • Production lead time is typically 15–25 days after drawing confirmation.

Questions we are asked before a tender

Can you supply to our consultant’s specification rather than your own? Yes — that is the normal case. Send the clause and the drawing and we confirm section, coating class and hole pattern against it.

Do you load under inspection? Loading is photographed, and container numbers and seals are recorded on the packing list.

Can you hold a delivery date across a staged programme? Yes, against a single order with agreed call-off dates.

Request Middle East pricing

Langkah seterusnya

Hantar keperluan anda kepada kami

Satu lukisan, senarai kuantiti atau satu baris spesifikasi sudah memadai untuk kami menyediakan pengiraan kuantiti dan harga.

Kami membalas dalam tempoh satu hari bekerja. Maklumat anda hanya dikongsi dengan pasukan jualan kami.

Memerlukan sebut harga untuk projek lebuh raya anda yang seterusnya?

Hantar lukisan, senarai kuantiti atau hanya nyatakan piawaian yang digunakan. Kami akan menyediakan pengiraan kuantiti, lukisan kerja dan harga kilang dalam tempoh satu hari bekerja.

Berbual di WhatsApp