Guardrail end treatments must match the approved barrier design and site layout. Confirm the exact model, connections and supporting documentation before ordering.
Matching the terminal to the run
Confirm the proposed configuration against the applicable test report and approved project drawing. Changes to dimensions, spacing, connections or anchorage require review; a component name alone does not establish system performance.
What the terminal has to be told
An end treatment is the one part of a run where the surrounding conditions matter more than the barrier does, so the specification starts with the site rather than with the terminal. Three answers decide it: what sits behind the termination, which way traffic approaches, and how much room there is between the end of the barrier and the start of the hazard. A terminal compressed into a short length behaves differently from the same unit with room to work.
Where the run is being extended, or is a repair, send a photograph of the existing end along with the drawing reference if one is available. A terminal matched to a run installed years ago can usually be supplied to the original drawing, and that matters more than it sounds: a mismatched end is where a repair quietly becomes a reconstruction.
Matching a specified end-terminal model
If a tender names ET-Plus, ET-2000, SKT or another terminal, provide the exact model, version and approved installation detail. Confirm the rail profile, post arrangement, mounting height and connections together; a similar product name or appearance does not establish compatibility.
For a quotation, include the product type, quantity, required standard and destination port. Email your drawing or bill of quantities if available.