Thrie-Beam Guardrail
Thrie-beam panels have three corrugations and a deeper profile than W-beam panels. Confirm panel dimensions and matching components…
View detailsThree-wave beam for higher containment levels: bridges, tunnels, high-traffic corridors and sites where a W-beam alone is not enough.
Thrie-beam panels have three corrugations and a deeper profile than W-beam panels. Confirm panel dimensions and matching components…
View details
Thrie-beam — Panel length: 4120 × 506 × 85 mm / 7920 × 506 × 85 mm; Section…
View detailsCompare the thrie-beam panels listed here by profile, dimensions, coating requirement and order specification. For system selection, posts, transitions and layout requirements, use the thrie-beam system guide. Open a product page for its detailed specification and enquiry.
| Profile | Three-wave (thrie) beam |
| Type | Thrie-beam; Type I: 550 g/m²; Type II: 1100 g/m² |
| Steel grade | A572 / Q345B / HA350 / Q235B / A36 / S355JR / S275JR |
| Coating | Type I: 550 g/m²; Type II: 1100 g/m²; 300 / 550 / 610 / 900 / 1100 / 1220 g/m² |
| Surface options | Hot-dip galvanized, plastic sprayed, powder coated |
| Section length | 4120 × 506 × 85 mm / 7920 × 506 × 85 mm; 2320 / 3320 / 4128 / 4218 / 4318 / 4320 mm |
| Posts | Matched to the rail height and the embedment condition |
| Standards | AASHTO M180, EN 1317, GB/T 31439, AS/NZS 3845, GOST 26804 |
| MOQ | 1 × 20GP container |
| Lead time | 15–25 days after deposit |
Because the thrie-beam shares its post range and its coating class with the W-beam, the usual specification is a mixed run: W-beam on the open approach, thrie-beam through the structure, a transition section between, and an end terminal at each free end. We quote the transition piece with the rest so the run is continuous rather than stitched together on site.
Send the drawing or the tender clause with the containment level and the post spacing. We will confirm the section type, the splice arrangement and the coating class, then return a take-off, a shop drawing and a factory price, normally within one working day. Certificates to EN 10204 3.1 travel with every shipment.
Send the drawing or the tender clause. We will confirm the section, the coating weight and the post spacing, then return a take-off and a factory price — usually within one working day.
Talk to an engineerSend the drawing, the bill of quantities or just the standard you are building to. We return a take-off, a shop drawing and a factory price within one working day.