Skip to content

Certifications & Testing

SinoBarrier ships every guardrail and roller barrier order with the certification paper a procurement team asks for. Two credentials matter most to highway projects, and both are produced and verified on our floor.

Our certifications

  • AASHTO M180 — hot-dip galvanized corrugated sheet steel beam, 550 g/m² minimum coating weight. See the AASHTO M180 detail.
  • MASH TL3 / TL4 — full-scale crash testing of the assembled barrier system, for W-beam, thrie-beam and roller barrier configurations.
  • EN 1317 / CE — the European standard for projects supplied into the EU, with CE documentation.

What you receive with an order

  • Mill test certificate for the base metal
  • Coating-weight test report
  • Packing list matching the bill of lading
  • Crash-test documentation for the system, where applicable

If a tender requires a certificate pack before you place the order, send the item number and quantity and we return the documents with your quotation.

What a certification pack has to prove

A certificate is only worth what can be checked against it. Three documents do most of the work in a guardrail tender, and each answers a different question: the mill test certificate proves what the steel was, the coating mass report proves what happened to it in the galvanizing bath, and the crash test documentation proves how the assembled system behaved when it was struck.

We issue all three with every order. The mill certificate is traceable to the heat number of the coil the beam was rolled from, so a sample cut from a delivered section can be followed back to the cast analysis. The coating report states zinc mass per unit area on both faces, measured rather than assumed. The crash test record names the configuration that was tested — section, post, spacing and coating class — which is the part a project engineer actually needs, because a test result only transfers to the configuration it was run on.

What each document settles

Document What it settles When it is issued
Mill test certificate The steel the section was rolled from, traceable to the heat number of the coil With the certificate pack, before or alongside the shipment
Coating mass report Zinc mass per unit area on both faces, measured rather than assumed Per production batch, with the shipment
Crash test documentation How the assembled system behaved on impact, and the configuration that was tested With the quotation where the project requires the supplier to be approved first
Third-party inspection release An independent signature on the three documents above On the nominated agency’s own letterhead, at the stage the project names

Third-party inspection and pre-shipment verification

Buyers who need an independent signature generally nominate SGS, BV or Intertek. We work with whichever the project names, at the stage the project prefers: in-process during roll forming and galvanizing, or pre-shipment once the container is loaded. Loading is photographed, container numbers and seal numbers are recorded on the packing list, and the inspection release note travels with the documents.

If a tender requires the certificate pack before the order is placed — common where a consultant has to approve the supplier first — send the item and the quantity and we return the documents with the quotation rather than after the deposit.

What a certificate does not cover

It is worth being plain about the limits, because the limits are what a serious buyer checks. A certificate describes the material and the finish, and for the crash-tested systems it describes the configuration that was evaluated. It does not certify how a system is installed, and it does not transfer to a run assembled differently from the tested article — a different post spacing, a different embedment, or a different offset between beam and post.

That is why the documents are read together with the drawing rather than instead of it. The certificate pack answers whether the hardware was built and tested as claimed; the drawing answers whether what is being installed is the thing that was certified. We supply both, and where the two disagree we raise it before the order rather than after it.

Frequently asked questions

Which certificate do I actually need?
For a steel guardrail tender, three: the mill test certificate for the base metal, the coating mass report for the galvanizing, and the crash test documentation for the assembled system. AASHTO M180 and MASH TL3 / TL4 are the standards those documents are written against in most export markets.
Can you issue the certificates before I place the order?
Yes. Where a consultant has to approve the supplier before the order is released, send the item and quantity and we return the certificate pack with the quotation. Nothing about the paperwork depends on the deposit having been paid.
Are the certificates original documents?
The mill test certificate and the coating report are issued as original stamped documents and travel with the shipment, not as scans emailed afterwards. Third-party inspection releases are issued by the nominated agency on its own letterhead.
Can we nominate our own inspection agency?
Yes. Most projects nominate SGS, BV or Intertek, but we will work with any agency the buyer names, either in-process at the plant or pre-shipment once the container is loaded and sealed.

Request certification documents

Next step

Send us your requirement

For a quotation, include the product type, quantity, required standard and destination port. Email your drawing or bill of quantities if available.

We reply within one working day. Your details stay with our sales team only.

Need a quotation for your next highway project?

Send the drawing, the bill of quantities or just the standard you are building to. We return a take-off, a shop drawing and a factory price within one working day.

Chat on WhatsApp