Guardrail Bolts and Nuts
Highway guardrail bolts and nuts are mainly used between guardrail and spacer, spacer and post, They play a…
View detailsHighway guardrail systems assembled from beam and post — W-beam and thrie-beam sections, posts, spacers, end terminals and the fastener package. Hot-dip galvanized to AASHTO M180, drawn to your standard.
Highway guardrail bolts and nuts are mainly used between guardrail and spacer, spacer and post, They play a…
View details
A U shape guardrail spacer is pressed from strip into the U profile that matches a lipped-channel post…
View details
A guardrail pavement marker picks out the line of the barrier at night, so a driver reads the…
View details
Galvanized W-beam panels for roadside barrier systems. Send your approved drawing to confirm dimensions, steel grade, hole pattern,…
View details
The trapezoidal guardrail spacer gives a wider, stiffer block-out than a flat spacer, which suits thrie-beam sections and…
View details
PVC coated W-beam guardrail puts a colored polymer jacket over the galvanized section for urban and mountain roads…
View details
The guardrail offset block holds the rail away from the post at the designed offset, which is what…
View details
Plastic-sprayed W-beam guardrail puts an electrostatic polyester powder coat over a hot-dip galvanized AASHTO M180 section — a…
View details
The F shape guardrail spacer is a folded block-out used where the post section and beam height require…
View detailsA highway guardrail is not one product. It is a system of five parts that has to be specified together: the beam that takes the impact, the post that holds it at the tested height, the spacer that sets the offset, the terminal that ends the run safely, and the bolts that tie the whole thing down. Change one and the geometry the barrier was crash-tested at changes with it. We manufacture all five in one plant, which is why a SinoBarrier order arrives as a matched set instead of four shipments from four suppliers that do not quite fit.
The plant in Guancheng County, Shandong has been rolling and galvanizing guardrail since 2010. Beam, post, spacer, terminal and fixing pack all go through the same hot-dip galvanizing line to a 550 g/m² minimum coating weight under AASHTO M180, and the same inspection regime, so a mixed container carries one coating certificate rather than five.
The catalogue splits into two families, and the first question on any project is which one applies.
Both lines are supplied to AASHTO M180, EN 1317, GB/T 31439, AS/NZS 3845 and GOST 26804, and both can be quoted from a standard drawing, a bill of quantities or a single tender clause.
| Beam profiles | W-beam (double wave) and thrie-beam (three wave) |
| Posts | C, U, Sigma, H, flange, square and round sections, 4.0–6.0 mm wall |
| Spacers | Box, H, U, C, F, trapezoidal and offset block, 2.5–5.0 mm |
| End terminals | Bridge, buffer, fishtail, flared and bullnose |
| Fixings | Bolts, nuts, washers, caps, reflectors and pavement markers |
| Steel grade | A572 / Q345B / HA350 / Q235B / A36 / S355JR / S275JR |
| Coating | Type I: 550 g/m²; Type II: 1100 g/m²; 300 / 550 / 610 / 900 / 1100 / 1220 g/m² |
| Standards | AASHTO M180, EN 1317, GB/T 31439, AS/NZS 3845, GOST 26804 |
| MOQ | 1 × 20GP container, or a mixed container of beam, posts and terminals |
| Lead time | 15–25 days after deposit |
With 555 projects delivered across 28 countries, the same drawings have been adapted to metric and imperial fasteners, left- and right-hand traffic, and soils from soft clay to rock.
Start from the containment level the project requires, then fix the profile and the post spacing. Send us the standard drawing or the tender clause and we will return a take-off, a shop drawing and a factory price, normally within one working day. Every order ships with mill test certificates to EN 10204 3.1, a loading plan and setting-out drawings; third-party inspection by SGS or BV can be arranged before shipment.
Send the drawing or the tender clause. We will confirm the section, the coating weight and the post spacing, then return a take-off and a factory price — usually within one working day.
Talk to an engineerSend the drawing, the bill of quantities or just the standard you are building to. We return a take-off, a shop drawing and a factory price within one working day.